March, 1983:
|
|
William Metal
Industrial Co., Ltd. was founded with capital of NTD1 million. Bought
1300 square meters of land in Taoyuan for the plant. Bought a 450-ton
oil press. Business items include the mold development, manufacturing
and selling of auto hood,fenders and coolant reservoir racks.
|
|
| |
August, 1985:
|
| Engaged
in the mold development of auto parts for foreign cars and expanded
export. Bought more land (totaling 2705 square meters), three 450-ton
oil press, one 250-ton punching machine, and three molding machines
for auto body. |
|
| |
Oct, 1987:
|
| Established
Jin-hong Auto Industrial, Co., LTD as William's conglomerate enterprise,
purchasing 2480 square meters of land, one 800-ton oil press, two
500-ton oil press, one 450-ton oil press, one 300-ton oil press, and
three molding machines for auto body. |
|
| |
March, 1990:
|
| Bought
Taiwan's first 5-axis holographic laser cutter. |
|
| |
Feb,
1995:
|
|
Increased the
land usage to 12100 square meters. Installed a whole set of EDP
automatic plating machine, 10 sets of oil press machineries and
large punching machines, 2 sets of 5-axis holo-graphic laser cutter,
one set of carving machine, and six molding machines for auto body.
|
|
| |
April, 1995:
|
| Passed
the plant assessment and become a certified part of the U.S. CAPA
quality assurance institution. |
|
| |
June, 1998:
|
| Bought
3834 square meter of land (totaling 15934 square meters). |
|
| |
Aug, 1998:
|
| Passed
the U.S. UL Quality Certification QS9000 & ISO 9002. |
|
| |
Nov, 1998:
|
| William
and Jin-hong merged with total capital of NTD89.2 million,expanded
by 8833 square meters. |
|
| |
Jan,
1999:
|
|
Adopted the
name of William Precision Industrial Co., Ltd., with William plant
1 adressed at No. 60-1, Neisi Road, Luchu Village, Taoyuan County,
Taiwan Province, and Willam plant 2 addressed at No. 39th Alley,
Neisi Road. Total capital is NTD 128.7 million.
|
|
| |
Sep,
2000:
|
| Increased capital to a total of NT
194,280,000. |
|
| |
Nov,
2003:
|
| Increased capital to a total of NT
198,900,000. |
|
| |
May,
2004:
|
Factory expansion at the main site.
Purchased 4 robots from Japan. |
|
| |
Jul,
2004:
|
Purchased CNC bending machine x1, Hydraulic
press for preforming x1, 4500T hydroforming machine x1.
Now have the capability to produce tube-hydroforming products. |
|
| |
Feb,
2005:
|
| Stremlined the production line to better
automate the production process, Purchased 4 robots and 2 welding
robots from Japan. |
|